110kV隆高898线多次跳闸原因分析及处理 被引量:1

Analysis and Treatment of Repeated Tripping of 110 kV Longgao 898 Transmission Lines
原文传递
导出
摘要 介绍了110kV隆高898线多次因雷击跳闸的情况并分析跳闸原因,指出该线路35号长江大跨越塔C相避雷器为故障点。结合现场情况提出了恢复线路大跨越段避雷线的线路防雷保护调整方案,调整后的线路运行正常,没有出现雷击跳闸情况。建议在线路运行工作中应加强对线路避雷器的检测。 Based on the introduction of multiple lightning tripping accidents and the cause analysis of tripping for 110 kV Longgao 898 transmission lines,the fault point of C-phase arrester on the 35# large crossing tower over the Yangtze River is pointed out in this paper.The adjustment scheme of line lightning protection,which was to restore the overhead grounding wires,was put forward combined with the site situation.The results show that the transmission line after the adjustment run normally.Therefore,it is suggested that the arrester monitoring in transmission lines management should be strengthened.
机构地区 镇江供电公司
出处 《电力建设》 2012年第12期97-100,共4页 Electric Power Construction
关键词 输电线路 雷击跳闸 避雷器 线路调整 transmission line lightning trip arrester line adjustment
  • 相关文献

参考文献10

二级参考文献22

共引文献81

同被引文献15

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部