浅谈隧道围岩加固及换拱施工技术 被引量:2

Preliminary Discussion on Tunnel Surrounding Rock Strengthening and Arch Exchanging Technology
下载PDF
导出
摘要 保(定)阜(平)高速公路韩家庄隧道因围岩中含蒙脱石等粘性矿物质,遇水软化膨胀造成已施工完毕的初期支护严重变形,侵入二次衬砌。为保证隧道施工的质量及安全,采用工字钢临时支撑加固原有初期支护,小导管注水泥-水玻璃浆固结围岩,然后拆除原初期支护。该方案对类似工程有一定的指导和借鉴意义。 There are cohesive minerals in surrounding rocks of Hanjiazhuang tunnel on Baoding to Fuping expressway. The preliminary lining of the tunnel is seriously deformed caused by the expansion of the rock and intrudes into the outline limit of the second lining. In order to ensure construction quality and safety, I-type steel is used to strengthen preliminary lining, small pipe grouting with cement-glass water slurry is adopted to strengthen surrounding rock, and finally the preliminary lining is exchanged. All the work can be a good reference to similar projects.
作者 夏勇
出处 《河北交通职业技术学院学报》 2010年第2期30-34,共5页 Journal of Hebei Jiaotong Vocational and Technical College
关键词 隧道工程 围岩加固 换拱 施工技术 tunnel surrounding rock strengthening arch exchanging construction technology
  • 相关文献

参考文献1

  • 1TB 10204-2002.铁路隧道施工规范[S]..2002

同被引文献7

  • 1铁道部工程设计鉴定中心编制,《高速铁路隧道》,中国铁道出版社.
  • 2《铁路隧道工程施工安全技术规程》(TBl0304-2009)中铁二局集团有限公司,中国铁道出版社.
  • 3《高速铁路隧道工程施工质量验收标准》(TBl0753-2010),中铁一局集团有限公司,中国铁道出版社.
  • 4《高速铁路隧道工程施工技术指南》(铁建设[2010]41号),中铁二局集团有限公司.中国铁道出版社.
  • 5《铁路隧道监控量测技术规程》(TB10121-2007),中铁二院工程集团有限责任公司,中国铁道出版社.
  • 6彭小兵.隧道变形侵限换拱施工技术[J].中华建设,2011(8):202-203. 被引量:3
  • 7吴志平.浅析隧道换拱施工技术[J].建筑知识:学术刊,2013(B09):254-254. 被引量:1

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部