摘要
应用PLAXIS非线性有限元软件,模拟了土工格室柔性搭板处治桥头跳车的施工及加载过程,通过对土工格室柔性搭板处治桥头跳车的影响因素的分析,提出了土工格室楔形柔性搭板的设计优化建议。
The construction and the loading process of using geocell reinforced flexible approach slab to treat vehicle bump at bridge end is simulated with PLAXIS nonlinear finite element software.Through the analysis of influence factors using geocell reinforced flexible approach slab to treat vehicle bump at bridge end,optimization design of geocell reinforced wedge-type flexible slab is proposed.
出处
《河北交通职业技术学院学报》
2010年第4期36-39,共4页
Journal of Hebei Jiaotong Vocational and Technical College
关键词
土工格室
柔性搭板
桥头跳车
geocell reinforced
flexible board
bridge-abutment vehicle bumping