摘要
结合北京-乌鲁木齐高速公路明水至哈密段项目部工地试验室的建设,详细介绍了高速公路工地试验室的试验用房、设备配置、技术文件配备、人员配备、临时资质申请及验收等相关环节的建设方法及注意事项。
Based on the site laboratory construction of Mingshui-Hami section of Beijing to Urumchi expressway, test room, equipments, technical documents, personel, temperoary certificate applying for and check-accept of site laboratory of expressway are introduced in detail, and matters needing attention are put forward.