结合工程实例,通过对各工况坝体稳定分析计算结果的对比,确定了本工程影响坝体安全的因素,为最终确定坝体结构布置方案提供依据,以供工程设计人员参考。
Combining with engineering example,through the comparison the stability analysis calculation results under each work condition,determined the factors affected the dam body safety of this project,provided basis for the final layout scheme of dam body structure,for engineering design reference.