摘要
针对政府投资项目控制工程造价存在的"三超"现象进行了分析研究,分别阐述了决策、设计、招投标、施工阶段的造价控制,并提出了一套科学的控制工程造价的措施与方法,对提高政府投资效益具有重要意义。
The paper analyzes and researches "the three excesses" in the controlling engineering cost in the government-invested programs,illustrates the engineering cost control from the decision-making,the design,the bidding,and the construction phase,and points out a set of scientific measures and methods for controlling engineering cost,so as to have the important meaning for improving the investment from government.
出处
《山西建筑》
2013年第6期233-236,共4页
Shanxi Architecture
关键词
政府投资项目
工程造价控制
问题
对策
government-invested program
engineering cost control
problem
strategies