摘要
研究了一类有分段式生产任务并带缓冲区约束的连续生产最早完工 (Makespan)指标调度问题。对积分形式约束和专注生产的约束进行有 效转化,将原调度问题转换为线性规划问题。仿真算例表明了文中方法 是可行的。
In this paper,the scheduling for a class of productions with piecewise pro- duction tasks and makespan requirements is studied. Through transforming the constraints in integration form and on the single product manufactur- ing,the problem can be solved with linear programming. Simulation for an actual example indicates that the algorithm mentioned is available.
出处
《系统工程》
CSCD
2000年第3期43-48,53,共7页
Systems Engineering
基金
国家863计划及重大基础研究(973)资助项目
关键词
化工生产过程
缓冲区
生产调度
连续生产过程
continuous production,linear programming, scheduling, buffer, bottom ca- pacity