浅析对当前条件下工程建设模式创新的一种探索--对中海油“十二五”期间工程建设模式的几点建议

Exploration on Innovation of Engineering Construction Model in Current Circumstance
下载PDF
导出
摘要 为支持总公司“二次跨越”目标的实现,中海油“十二五”及以后时期的工程建设将进入更加繁忙的阶段。为从根本上缓解繁重的工程建设任务与工期紧、资源短缺的矛盾,该文建议从设计方案优化、设计管理优化、施工模式创新、人员配置方式创新等方面入手,建立“注重前期设计、注重新技术和新方法应用”的新模式,探索工程建设模式的转变,以实现提高工程质量、缩短建设周期的目标。 In order to accomplish the goal of "the second leap forward", the engineering construction of CNOOC will enter a much busy phase in the period of 'the twelfth five years plan' and later. Aiming at reduction of the contradiction between onerous engineering construction and limited period of construction and resource shortage, this article recommends to exploring new model of engineering construction such as "focusing on the engineering phase, focusing on the application of new technology and methodology" which means optimizing engineering proposal and engineering management, innovating construction model and personnel collocation model. In result, higher quality and shorter period of construction should be achieved.
出处 《中国造船》 EI CSCD 北大核心 2013年第A01期401-414,共14页 Shipbuilding of China
关键词 创新 工程建设模式 工期 建造模式 人员配置方式 innovation model of engineering construction period of construction model of fabrication personnel collocation model
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部