摘要
济钢第一炼铁厂对 4#3 5 0 m3高炉自动上料系统进行部分升级改造 ,改变硬件配置 ,解决了新旧设备的通讯衔接等问题。系统升级后 ,故障率下降 2 .3 % ,保证了高炉的高产。
The partial escalation and reformation have been done to automatically feeding system of No.4 350m 3 blast furnace of Jinan iron and steel group.Through changing hardware matching the connected question of communication between new and old equipments has been solved.After this system was esealated the acciden ratio was decreased by 2.3% and it has ensured the high productivity and smooth production of the blast furnace.
出处
《山东冶金》
CAS
2000年第2期29-30,共2页
Shandong Metallurgy