期刊文献+

滑模技术在糯扎渡水电站溢洪道抗冲耐磨混凝土中应用 被引量:2

Application of Sliding Formworks in Scouring-and Wearing-Resistance Concrete Placement of Spillway,Nuozhadu Hydropower Project
下载PDF
导出
摘要 糯扎渡水电站溢洪道泄槽段底板混凝土处于高流速区,对混凝土浇筑质量要求极高,为保证底板抗冲耐磨混凝土施工质量和外观质量,陡槽段23%坡段底板和掺气坎反坡段主要采用滑模技术进行施工。文章详细介绍了滑模系统的组成、极限承载校核以及滑模施工时应注意的问题。经检测,该底板混凝土施工质量达到优良。 the floor concrete at the chute section of spillway, Nuozhadu Hydropower Project, is seated at the area with high-velocity flow. So, quality of the concrete placement is strictly required. To assure quality of both construction and appearance of the scouring- and wearing- resistance concrete of the floor, 23% the slope floor at the steep chute section and reverse slope section of aerator are con- creted by application of the sliding formworks especially. In this paper, components and limit bearing check of the sliding formworks as well as key points for construction with application of the sliding formworks are introduced in detail. The inspection shows that the con- struction quality of the floor concrete placement is excellent.
出处 《西北水电》 2012年第A02期72-75,共4页 Northwest Hydropower
关键词 糯扎渡水电站 溢洪道 抗冲耐磨 混凝土 滑模 Nuozhadu Hydropower Project spillway scouring- and wearing- resistance concrete sliding formworks
  • 相关文献

参考文献4

二级参考文献6

共引文献3

同被引文献11

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...