糯扎渡水电站工程悬臂梁施工工艺

Technology on Construction of Cantilever Beam,Nuozhadu Hydropower Project
下载PDF
导出
摘要 悬臂梁结构作为水电工程中常见的施工结构,其施工工艺较为复杂,质量控制难点多。文章结合糯扎渡电站进水塔悬臂梁施工工艺,从悬臂梁模板施工控制、钢筋工艺、混凝土入仓、振捣等施工控制重点进行阐述,其施工参数和工艺可为同类型工程提供借鉴。 The cantilever beam is a common structure in hydropower projects. Its construction technology is complicated and difficulties in term of its quality control of construction are a lot. In combination with the construction technology of the intake tower of Nuozhadu Hydro- power Project, the key control points of construction from installation control of cantilever formworks, technology on reinforcement pro- cessing, concrete placed in blocks till vibration, etc are described especially in this paper. The construction parameters and technology can be referred to other similar projects.
出处 《西北水电》 2012年第A02期84-87,共4页 Northwest Hydropower
关键词 悬臂梁 混凝土 施工 工艺 承重平台 cantilever concrete construction technology bearing platform
  • 相关文献

参考文献2

  • 1GB50205-2001,钢结构工程施工质量验收规范[S].北京:计划出版社,2002.
  • 2JGJ130-2011,建筑扣件式钢管脚手架安全技术规程[s].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部