摘要
对糯扎渡水电站心墙堆石坝掺砾土料的压实度检测方法进行对比碾压试验分析,找出快速的检测方法。
through comparison of the inspection methods for compaction degree of the oils with gravel mixed for the cutoff wall of rockfill dam of Nuozhadu Hydropower Project and analysis on compaction tests, quick inspection methods are seeked.
出处
《西北水电》
2012年第A02期96-100,共5页
Northwest Hydropower
关键词
预控线法
三点快速击实法
质量控制
糯扎渡水电站
pre-control line method
three-point quick compaction method
qu^ity control
Nuozhadu Hydropower Project