摘要 盐龙湖取水泵房总规模为60×104m3/d,水源取自水源生态净化湖泊——盐龙湖,泵房建于盐龙湖内,对泵房位置、泵型选择、构筑物形式、进水方式、水泵充水方式等方案进行了论证,确定了可靠的工程方案,缩短了工期,节约了工程投资。目前,该工程已竣工投产,运行状况良好。 The total capacity of Yanlong Lake water intake pumping station is 60×10^4m^3/d. Water is taken from an ecological purification lake, Yanlong Lake, and the pumping station was built inside the lake. The station location, pump type selection, structure form, water pumping way and water filling way were demonstrated. A reliable project scheme was determined, the construction period was shortened, and the project investment was saved. Currently, this project has been completed and put into operation with good effect.
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第4期50-52,共3页 China Water & Wastewater
关键词 盐龙湖 取水泵房设计 泵房位置 构筑形式 充水方式 water filling Yanlong Lake water intake pumping station design station location structure way
  • 相关文献

参考文献6

二级参考文献3

  • 1戚盛豪 汪洪秀 王家华.给水排水设计手册(第3册)(第二版)[M].北京:中国建筑工业出版社,2004年4月..
  • 2黄伟谋.电力工业标准汇编(火电卷)(第9册)[M].北京:中国电力出版社,1996年3月..
  • 3给水排水设计手册编写组.给水排水设计手册(第3册)[M].北京:中国建筑工业出版社,2004.

共引文献7

同被引文献2

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部