介绍了无锡市城北污水处理厂四期工程的设计概况和所采用的MBR工艺的情况,总结了相关MBR工艺调试的经验。监测数据表明,该工艺运行稳定可靠,出水水质稳定达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准,实现了污水处理厂的正常运行。
The design situation of phase IV project of Wuxi Chengbei WWTP and the membrane bioreator(MBR) process were introduced. The experience related to the commissioning of MBR process was summarized. The monitoring data indicated that the process showed a stable and reliable operation. The effluent quality met the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 - 2002 ). The normal operation of the WWTP was achieved.