摘要
在简单介绍D-InSAR形变监测原理的基础上,分析了影响差分干涉结果精度的误差源,并给出了可能的消除办法。最后以陕北神木县大柳塔矿区为例,利用D-InSAR技术获取了该矿区的地表沉降,结果表明,D-InSAR技术可以有效地提供矿区沉降的最新信息,用于指导矿区生产和整体规划。
This paper gave a brief introduction of D-InSAR deformation monitoring principles and analysed the error sources which impact on the accuracy of the differential interference.This paper also gave the possible ways to eliminate the error sources.Finally this paper took the North Shaanxi province Shenmu Daliuta mine as an example and gained this mining area surface subsidence using the D-InSAR technology.The result had proved that D-InSAR technology could effectively provide the latest information of mining area subsidence and guide the production and the overall mining area planning.
出处
《山西建筑》
2012年第22期73-75,共3页
Shanxi Architecture
基金
国家自然科学基金重点项目(项目编号:40534021
40672173)
国土资源大调查项目(项目编号:1212010440410)