摘要
结合新奥法施工特点,在太原至古交高速公路周家山隧道施工过程中,通过使用PROFILER 4000型全断面仪和SIR-3000型地质雷达(GPR)实施监控量测,确保了隧道施工安全。
Combining with the construction features of the New Austrian Method,the study implements the monitoring measurement in the construction process of Zhoujiashan Tunnel along Taiyuan-Gujiao Expressway by adopting PROFILER 4000 general profiler and SIR-3000 geological radar(GPR),so as to ensure the safety of the tunnel construction.
出处
《山西建筑》
2012年第22期198-199,共2页
Shanxi Architecture
关键词
隧道
施工
监控量测
地质雷达
全断面仪
tunnel
construction
monitoring measurement
geological radar
general profiler