天津铁厂于1998年7月4#高炉进行了扩容改造大修,大修后的4#高炉装备水平处于国内先进水平,文章对4#高炉扩容大修的技术改造情况进行了总结。
The 4 # furnace of Tianjin Iron Plant was rebuilt in July, 1998.The equipment levels of the post - rebuilt 4 # furnace is in the leading posidon at home. Technology of expanding capacity rebuildings of 4 # furnace is summarized here.
出处
《天津冶金》
CAS
2000年第4期16-18,共3页
Tianjin Metallurgy
关键词
高炉
扩容改造
大修
furnace expanding capacity rebuild technology equipment