期刊文献+

基于关键零部件质量的Petri网的柔性装配系统装配顺序规划 被引量:1

Assembly sequence planning of flexible assembly system based-quality for key parts
下载PDF
导出
摘要 本文针对产品装配中关键零部件质量的保证问题 ,引入装配质量置信度概念 ,并在装配顺序规划中提出以关键零部件装配质量为装配顺序规划目标的规划算法 ,解决了柔性装配系统规划中装配质量及其定量化问题。并以摩托车发动机气门装配组件的装配为算例 ,证明本文提出的算法是完全可行的。 Aiming at the problem of insuring quality of key parts and with the concept of assembly certainty, this paper introduces the algorithm for assembly sequence planning. A quantitative analysis method for quality in planning of flaxible assembly system is given. The algorithm is approved feasible through the application to the assembly of a motorcycle engine.
机构地区 华南理工大学
出处 《机床与液压》 北大核心 2000年第3期5-6,43,共3页 Machine Tool & Hydraulics
基金 国家"八六三"高技术计划资助! (863 -5 12 -0 5 -0 7)
关键词 柔性装配系统 PETRI网 质量 装配顺序规划 Flexible assembly system Petri net Quality
  • 相关文献

参考文献3

二级参考文献2

  • 1舒贤林,图论基础及应用,1991年
  • 2张伯鹏,机电智能控制工程,1991年

共引文献37

同被引文献12

  • 1BEN-ARIEH D, KUMAR R R, TIWARI M K. Analysis of assembly operation's difficulty using enhanced expert high- level colored fuzzy Petri net model[J]. Robotics and Computer-Integrated Manufacturing, 2004, 20(5) :385-403.
  • 2SINANOGLU C, BORKLU H R. An approach to determine geometric feasibility to assembly states by intersection matrices in assembly sequence planning[J]. Journal of Intelligent Manufacturing, 2004, 15(4):543-559.
  • 3BOURJAUIT A, Contribution to a methodological apporach of automated assembly: automatic generation of assembly sequence[D]. Besancon, France: University of Franchecomte,1984(in French).
  • 4BOURJAULT A. Contribution dune approach m'ethodologique de I'assemblage automatis'e: elaboration automatique des ' op' eratoires, these d″sequences etat [D]. Besancon, France : Universit'e de Franche-Comt'e, 1984.
  • 5HOMEM DE MELLO L S, SANDERSON A C. A correct and complete algorithm for the generation of mechanical assembly sequence[J]. IEEE Transactions on Robotics and Automation, 1991, 7(2):228-240.
  • 6GOTTIPOLU R B, GHOSH K. A simplified and efficient representation for evaluation and selection of assembly sequences [J]. Computer in Industry, 2003, 50(3):251-264.
  • 7PICH M M, BOVINA C, FORMIGGINI G, et al: PDES--an expert system for constructing the precedence diagram [J]. Journal of the Franklin Institute, 1996, 333(6) : 975-990.
  • 8WARRATS J J, BONSCHANCHER N, BRONSVOORT W F. A semi-automatic sequence planner[C]//Proceedings of IEEE International Conference on Robotics and Automation.Piscataway, N.J. , USA: IEEE Press, 1992 : 2431-2438.
  • 9HOMEM DE MELLO L S, SANDERSON A C. AND/OR graph representation of assembly plans[J]. IEEE Transactions on Robotics and Automation, 1990, 6(2):188-199.
  • 10THOMAS J P. Constructing assembly plans[C]//Proceedings of IEEE International Conference on Robotics and Automation. Piseataway, N.J., USA: IEEE Press, 1993:515-520.

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部