大规模风电接入对电力系统有功调度的影响分析 被引量:13

Influence Analysis on Active Power Dispatch by Introduction of Large Wind Power
下载PDF
导出
摘要 大规模风电功率的随机波动性是当前公认的制约风电发展的瓶颈,同时风电的反调峰特性拉大了电网的峰谷差,增大了有功调度控制的难度;风电接入后,现有的系统备用容量确定方法和调度计划制定策略已无法满足电网企业兼顾安全经济的控制目标。针对此,对大规模风电接入对系统备用容量及发电计划的影响进行了研究,分析了风电接入后电网运行中面临的实际问题,并对目前的相关研究进行了归纳,给出了解决方法;指出多源互补的备用配合策略及多时空尺度协调的备用与发电计划联合优化策略适用于大规模风电接入的合理备用优化,考虑风电场出力耦合关系的有功发电调度策略适用于大规模风电接入的合理有功优化。 Random volatility of large wind electricity power is recognized as bottleneck to restrict wind power development and meanwhile, reverse load characteristics of wind power increase peak valley of power grid and enlarge difficulties in ac- tive power dispatching control. After introducing wind power, determination method and dispatching plan formulation for present system reserve capacity can not meet control objective of power grid enterprises which give consideration to safety and economy. Therefore, this paper studies influence on system reserve capacity and generation plan by introduction of large wind power, analyzes practical problems in power grid operation, concludes present relevant research and proposes solu- tions. It points out that multisource complementary reserve coordination strategy and joint optimization strategy of multi- space dimension coordination reserve and generation plan are appropriate for reasonable reserve optimization of large wind power introduction and strategy of active power generation dispatch considering of output coupling of wind power plant is appropriate for reasonable active power optimization.
出处 《广东电力》 2013年第1期33-37,共5页 Guangdong Electric Power
基金 广东电网公司2011科研项目(K-GD2011-48)
关键词 运行备用 有功发电计划 多时空尺度协调 operating reserve active power generation plan multi-space dimension coordination
  • 相关文献

参考文献28

  • 1中国电力监管委员会.风电、光伏发电情况监管报告[R]北京,2011.
  • 2ACKERMAN T,ABBAD J R,DUDURYCH I M. European Balancing Act[J].IEEE Power and Energy Magazine,2007,(06):90-103.
  • 3吴淳.风电对电力系统调频和备用的影响研究[J].华东电力,2011,39(6):993-997. 被引量:11
  • 4张国强,吴文传,张伯明.考虑风电接入的有功运行备用协调优化[J].电力系统自动化,2011,35(12):15-19. 被引量:55
  • 5BODO D R,MAUZY D M,TREFNY F J. Economic Generation Dispatch with Responsive Spinning Reserve Constraints[J].IEEE Transactions on Power Systems,1994,(01):555-559.doi:10.1109/59.317566.
  • 6DOHERTY R. System Operation with a Significant Wind Power Penetration[J].IEEE Transactions on Power Systems,2005,(02):587-595.doi:10.1109/TPWRS.2005.846206.
  • 7DOHERTY R. A New Approach to Quantify Reserve Demand in Systems With Significant Installed Wind Capacity[J].IEEE Transactions on Power Systems,2005,(02):587-595.doi:10.1109/TPWRS.2005.846206.
  • 8DANY G. Power Reserve in Interconnected Systems with High Wind Power Production[J].IEEE Porto Power Tech Proceedings,2001,(06):10-13.
  • 9肖创英,汪宁渤,丁坤,陟晶.甘肃酒泉风电功率调节方式的研究[J].中国电机工程学报,2010,30(10):1-7. 被引量:132
  • 10衣立东,朱敏奕,魏磊,姜宁,于广亮.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132. 被引量:115

二级参考文献126

共引文献956

同被引文献86

引证文献13

二级引证文献91

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部