摘要
本文介绍了包钢二烧车间90m2机上冷却烧结机技术指标、工艺流程特点以及小球烧结技术应用情况,同时扼要地讲述了改造内容、主体设备。并对改造前后技术指标进行了对比,通过一年的生产证明采用机冷工艺后,利用系数提高0.041/m2·h,最高达到0.101t/m2·h,固体能耗降低7.274kg/t。
The paper presents the technical indices, process characteristics and application of MPS process at the NO .2 sinter plant with sinter machine cooling technology. The modification and main equipments are briefly described.Comparison between technical indices before and after modification is made. After one year sintering practice,it has been proved that the productivity increases by 0.041t/m2·h (highest value 0.101t/m2·h) and the solid fuel consumption decreases by 7.274kg/t with sinter machine cooling process.
出处
《包钢科技》
2000年第1期6-9,共4页
Science & Technology of Baotou Steel