摘要
文章以天龙湖地下水电站工程为实例,简要论述地下厂房及尾水系统开挖支护施工的相关技术问题,并对其开挖分层、开挖方法。开挖支护的施工技术方法进行了总结。
Taking Tianlonghu groundwater power station as an example, the paper introduces the relevant technical issues on the construction of excavation and support of groundwater powerhouse and tailrace system and summarizes the excavation in layers, the excavation method, the sequence and the construction technique of excavation and support.
出处
《东北水利水电》
2013年第2期18-20,71,共3页
Water Resources & Hydropower of Northeast China
关键词
地下厂房
尾水系统
开挖
支护
groundwater powerhouse
tailrace system
excavation
supporting