摘要
本文通过介绍旧厂房内吊车梁更换的实例,提出了比较实用的设计思路和施工步骤,并对计算结果进行分析,得出一般性结论。同时给出处理类似问题的方法和建议。
Introduce a project case of changing the crane beam in the old plant building and put forward the practical design ideals and construction procedures. Analyze the calculation results and draw general conclusions, and also provide the treatment methods and suggestions for the similar problems.
出处
《冶金设备管理与维修》
2013年第1期67-68,70,共3页
Metallurgical Equipment Management and Maintenance
关键词
吊车梁
抗风桁架
辅助桁架
柱肩梁
设计方法
施工步骤
Crane beam, wind-resisting truss, auxiliary truss, column shoulder beam, design method, construction procedure