8HIROSHI NAKAMURA,TOSHIKAZU KUBOTA,MAMORU FURUKAWA. Unified Construction of Running Track Tunnel and Crossover Tunnel for Subway by Rectangular Shape Double Track Cross-section Shield Machine[J].Tunnelling and Underground Space Technology,2003,(2-3):253-262.
9TOSHIHIRO ASAKURA,YOSHIYUKI KOJIMA,TOYOHIRO ANDO. Analysis on the Behavior of Tunnel Lining-experiment and Simulation on Double Track Tunnel Lining[J].QR of RIRT,1992,(04):266-273.