期刊文献+

复合材料自动铺带工艺工时估算及软件开发 被引量:2

Process Time Estimation Model for Composite Automated Tape Laying and Its Code Development
下载PDF
导出
摘要 基于制造工艺过程的成本模型,建立复合材料自动铺带工艺工时估算方法,开发了工时估算软件。根据铺带头的运动规律建立工时估算方程,并考虑了材料卷盘的更换时间;采用Delphi语言和SQL Service数据库管理系统编制工时估算软件,通过Visual Basic语言对CATIA进行二次开发,编制零件工时估算特征提取插件,提高软件效率。应用软件对某型飞机的平尾多肋式翼盒与多梁式翼盒方案的铺放时间进行分析,结果表明,多梁式翼盒由于采用整体化结构设计,可减轻结构重量,缩短制造工时,降低制造成本。 A process time estimation model is proposed for composite automated tape laying (ATL) on the basis of the manufacturing process-based cost modeling, and the process time estimation software is developed. Time estimating equations for ATL are established based on the motion law of the tape lay- ing head, and the time for changing a tape roll is considered. Then a time estimation code is developed by using software of Delphi and SQL Service, and a part feature extraction plug-in is built using Visual Basic software to improve the efficiency of the developed code based on CATIA secondary development. The ATL lay-up time of two kinds of horizontal stabilizer outboard sections with multiple ribs and mul- tiple spars are estimated by using the developed code. The results indicate that the horizontal stabilizer outboard sections with multiple spars can lighten the structure weight, shorten the process time, and reduce the cost due to the integral structure design concept.
出处 《南京航空航天大学学报》 EI CAS CSCD 北大核心 2013年第1期38-42,共5页 Journal of Nanjing University of Aeronautics & Astronautics
关键词 复合材料 自动铺带 工时估算模型 铺放效率 平尾 composite automated tape laying time estimation model lay-up rate horizontal stabilizer
  • 相关文献

参考文献14

  • 1Watson R,Kwak Y H. Parametric estimating in the knowledge age:Capitalizing on technological advances[A].Washington,DC:[s.n.],2004.1-11.
  • 2Gutowski T G,Hoult D,Dillon G. Development of a theoretical cost model for advanced composite fabrication[J].Composites Manufacturing,1994,(04):231-239.
  • 3Hess R W,Romanoff H P. Aircraft airframe cost estimating relationships.Study approach and conclusions RAND/R-3255-AF[R].1987.
  • 4PRICE Corp. PRICE H fundamentals course material[M].New Jersey:Price Systems L L C,2004.7-36.
  • 5Leblanc D J,Kokawa A,Bettner T. Advanced composite cost estimating manual[R].California:Northrop Corporation,AFFDL-TR-76-87,1976.
  • 6Ilcewicz L B,Mabson G E,Metschan S L. Cost optimization software for transport aircraft design evaluation (COSTADE)-cost design methods NASA CR-4737[R].1996.
  • 7刘玲,张博明,王殿富,张宝艳,邢丽英,陈祥宝.热压釜成型工艺工时估算的理论模型[J].复合材料学报,2004,21(3):146-150. 被引量:5
  • 8叶金蕊,张博明.热压釜成型复合材料波纹梁工艺工时估算[J].复合材料学报,2009,26(1):65-73. 被引量:1
  • 9叶强,陈普会,柴亚南.复合材料结构制造成本估算模型及软件开发[J].复合材料学报,2008,25(4):161-167. 被引量:5
  • 10Grimshaw M N,Grant C G,Diza J M L. Advanced technology tape laying for affordable manufacturing of large composite structures[A].Long beach,CA:[s.n.],2001.2484-2494.

二级参考文献71

共引文献79

同被引文献108

引证文献2

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部