滩海人工岛工程安全监测自动化系统研究 被引量:3

A study of an automatic monitoring system for artificial islands
下载PDF
导出
摘要 基于海上油气生产的人工岛安全性需要,提出了滩海人工岛工程运行期安全监测方法和技术要求,安全监测宜采用自动化系统.结合冀东油田1-3#人工岛工程运行期安全监测系统研究,在国内首次开发和建立了滩海人工岛工程安全监测自动化系统,实现了滩海人工岛实时自动监测、数据处理、信息发布和预警等.系统初步运行结果表明,1-3#人工岛工程运行期围堤存在明显的不均匀沉降,岛体存在体缩现象.研究成果为滩海人工岛工程运行期阶段的管理和维护提供了技术依据和保障,对滩海工程运行期的安全监测具有指导作用. Based on the safety requirements of the artificial islands for marine production of oil and gas, the monitoring methods and technical requirements are put forward for the artificial islands in coastal areas during operation stage. Based on researches on the safety monitoring automatic system for the artificial island of 1-3# of Jidong Oilfield Company, a safety monitoring automatic system for the artificial islands in the coastal areas in China is first developed and established so as to realize real-time automatic monitoring, data processing, information release and warning for the artificial islands in the coastal areas. The preliminary operation results show that the artificial island 1-3# exhibits obvious nonuniform settlement and shrinkage phenomenon during operation period. The research results will provide technical basis and support for the safe construction and management of the artificial islands in the coastal areas during operation stage. It can be used as a reference to the safety monitoring of the coastal projects during operation stage.
出处 《水利水运工程学报》 CSCD 北大核心 2013年第1期66-70,共5页 Hydro-Science and Engineering
关键词 运行期 人工岛 安全监测 自动化系统 围堤 operation stage artificial island safety monitoring automatic system embankment
  • 相关文献

参考文献9

二级参考文献33

  • 1黄明毅.南导堤局部堤身下沉情况分析及加固设计[J].港湾技术,2000(4):51-66. 被引量:1
  • 2李炎保,张效铭,谷剑秋,张兴无.大直径圆筒结构施工期稳定性的试验和分析[J].港口工程,1995(2):39-42. 被引量:1
  • 3.南导堤S0+600~S1+604局部堤身下沉情况的综合报告[R].上海:长江口航道建设有限公司,2000.6.
  • 4谢军.南导堤S0+000-S1+600段导堤南、北两侧水位差二维潮流数模[R].,1999.11.
  • 5Tomohiro Yasuda, Hajime Mase, Tomotsuka Takayama, Statistical characteristics of sea walls damaged by storm waves, Proc[A].27th ICCE[C].2000.2 229-2 239.
  • 6H Oumeraci.Review and analysis of vertical breakwater failures-lessons leaned[J].Coastal Engineering,1994,22:3-29.
  • 7H Oumeraci,A Kortenhaus, W Allpos, etc.Probabilistic Design Methods for Vertical Breakwater,Bllkema Publishers, 2001.
  • 8S Y Tzang, S S Hsiao, A case study on typhoon-induced consecutive damages on coastal structures at Keelung coast, Taiwan[A].Coastal Structures'99, Losada(ed), 2000,Balkema, Rotterdam, 1 017-1 025.
  • 9Sousuke Hitachi.Case study of breakwater damage:Mutsu-Ogawara Port[A].Proc. of Int. workshop on wave barriers in deepwaters[C].Yokosuka, 1994.308-331.
  • 10Michio Gomyoh, Kazuhiko Sakai,Tomotuka Takayama,etc.Field investigations on wave-dissipating concrete blocks covering vertical wall breakwater[A].Proc. 25th ICCE[C].1996.1 652-1 664.

共引文献83

同被引文献10

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部