8Azari H,McCuen R H,Stuart K D.Optimum compaction temperature formodified binders[J].Journal of Transportation Engineering,2003,129(5):531-537.
9Wang S Q,Tiong R L K,et al.Evaluation and management of political risks inChina's BOT projects[J].Journal of Construction Engineering and Management,2000,126(3):242-250.
10Roger Miller,Donald Lessard.Understanding and managing risks in largeengineering projects[J].International Journal of Project Management,2001,19:437-443.
9Transportation Research Board of National Academies. Glossary of highway quality assurance terms[R]. Transportation Research Circular E- C074,2005.
10Hughes C S. State construction quality assurance programs: A synthesis of highway practice[Z]. NCHRP Synthesis 346, Washington DC: National Cooperative Highway Research Program,2005.