下承式钢筋混凝土系杆拱桥的设计难点分析

Design difficulties analysis of the concrete-filled steel reinforced concrete bowstring arch bridge
下载PDF
导出
摘要 钢筋混凝土系杆拱桥由于造型美观、结构合理等因素而广泛应用于跨越河道、山谷和城市桥梁中,但其设计过程也存在着许多需要引起足够重视的技术难点,如果考虑不周将给桥梁带来永久性损伤,甚至威胁到桥梁安全。结合京航运河80 m下承式系杆拱桥的设计过程,分析了此类桥梁设计中的计算难点。 Due to many factors such as its pleasing aesthetics, reasonable structure, reinforced concrete tied -arch bridge is widely used in acrossing the river, the valley and the city, but its design process also has many technology difficulty needing to pay more attention, if the consideration is not sufficiency, which will bring permanent damage to the bridge, even threatening the safety of the bridge. Combining with the design process of a 80m main span through tied -arch bridge on the Jing- Hang Canal, analyzes the calculation difficulty in the design of the type of the bridges, which can be referenced by similar Bridges design.
作者 丁毅
出处 《山东交通科技》 2012年第6期34-35,共2页
关键词 系杆拱桥 温度梯度 横梁约束 tied - arch bridge temperature gradient restraint of transverse girder
  • 相关文献

参考文献4

二级参考文献21

共引文献165

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部