摘要
分析了文登抽水蓄能电站工程区地形地貌特点,介绍了施工布置方案比选、施工分区布置、交通运输、碴场规划设计,总结了施工总布置设计理念。
based on the analysis of the characteristics of the landform of Wendeng Pumped-storage Power Plant, comparison and selection of construction layout schemes, construction zoning layout, construction and transport accesses, and planning and design of spoiled areas are introduced as well as the design concept of general layout for construction is summarized.
出处
《西北水电》
2013年第1期29-32,共4页
Northwest Hydropower
关键词
施工总布置
施工交通
文登抽水蓄能电站
general layout for construction
construction access
Wendeng pumped-storage Power Plant