上海工业厂房地源热泵空调系统设计与测试分析

Design and Testing Analysis of GSHP Air Conditioning System in Industrial Plants in Shanghai
下载PDF
导出
摘要 夏热冬冷地区工业建筑使用地源热泵空调系统容易出现冬夏季热不平衡问题,本文以上海某工业厂房为例,详细介绍了地埋管系统设计方案及冬夏季热不平衡的解决方案,并对地源热泵空调系统夏季和冬季典型运行工况进行了测试分析。 In those areas where it is hot in summer and cold in winter, heat unbal ance often happens in summer and winter in the industrial buildings with GSHP (Ground Source Heat Pump) air conditioning system. The thesis takes some industrial plant in Shanghai as an example to particularly describe buried pipe system design scheme and the solution about heat unbalance in summer and winter, and tests and analyzes typical operational condition of GSHP air conditioning system in summer and winter.
出处 《住宅科技》 2013年第2期12-14,共3页 Housing Science
基金 上海市科委科研项目低碳工业厂房围护结构节能及沿海软土地基对地源热泵系统的影响研究 项目编号:10dz1211103
关键词 工业厂房 地源热泵 地埋管设计 热不平衡 运行测试 industrial plant, GSHP, buried pipe design, heat unbalance, operational testing
  • 相关文献

参考文献3

  • 1许居鸩.机械工业采暖通风与空调设计手册[M]上海:同济大学出版社,20073.
  • 2陆耀庆.实用供热空调设计手册[M]北京:中国建筑工业出版社,20084.
  • 3鲍谦;张旭.冷热负荷不平衡率的地埋管系统换热特性数值模拟[A],2010.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部