期刊文献+

测试性验证试验方案的工程修正方法研究 被引量:5

Study on Engineering Correction Method of Testability Validation Test Plan
下载PDF
导出
摘要 针对目前测试性验证试验理论不完全适合工程应用的现状,按照测试性验证试验设计流程先后顺序,阐述了在样本量确定和分层抽样中遇到的具体问题,结合基于二项分布的测试性验证试验的方案设计理论,提出了面向不同样本空间的按比例分层抽样方法,同时对原有测试性验证试验理论中样本量和故障判据的确认方法进行修正,实现工程适用的测试性验证方法。本修正方法从测试性验证试验的基本原理上确保了试验验证的准确性和合理性,对工程应用具有一定的指导性。 At present, the theory of testability validation test is not suit for engineering completely. According to designing flow of testability validation test, the problem met in determining the sample size and stratified sam- pling is expatiated. According to the testability validation test plan based on the theory of binomial distribution, the proportional stratified sampling for different sample space is introduced, and the method for confirming the sample size and failure criteria is revised, and the testability validation test method is achieved in engineering utility. The correction method assures the accuracy and reasonableness of the testability validating on the basic principle of testability validation test, and has some guides for engineering application.
出处 《测控技术》 CSCD 北大核心 2013年第2期126-127,132,共3页 Measurement & Control Technology
关键词 测试性验证试验方案 二项分布 工程修正 样本量确定 按比例分层抽样 testability validation test plan binomial distribution engineering correction determining the sam- ple size stratified sampling in proportion
  • 相关文献

参考文献1

  • 1田仲;石君友.系统测试性设计分析与验证[M]北京:北京航空航天大学出版社,2003.

同被引文献30

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部