摘要
通过理论分析和实地调查,深入了解河南红旗三矿的矿山地质环境情况,利用定量-半定量评估方法对其地质环境影响程度进行了现状评估和预测评估,利用叠加法划分了地质环境保护与恢复治理区域,有针对性地提出了预防、保护和恢复治理的技术措施,工程设计人员从事类似工程设计提供一定的参考依据。
Through theoretical analysis and field survey, the geological environment problems in Hongqi Third Mine of He'nan are found out and understood deeply, the quantitative-half quantitative evaluation method is used for the present situation evaluation and predictive evaluation of the geological environment effects, the superposition method is used tor dividing the geological environment protection and treatment area, and the technical measures for prevention, protection, recovery and management are put forward targetedly, which could provide some references for other engineering design personnel of similar projects.
出处
《水利与建筑工程学报》
2013年第1期144-147,共4页
Journal of Water Resources and Architectural Engineering
关键词
矿山
地质环境
保护
恢复
mine
geological environment
protection
recovery