摘要 采用预埋的振弦传感器对喀兰古连续箱梁桥在施工过程中的箱梁温度场进行了现场实测。利用ANSYS有限元软件建立该桥0#段有限元模型,对该结构在施工阶段的温度应力进行了模拟计算,并与实测应力进行对比分析,得到喀兰古连续箱梁桥在施工阶段的温度应力分布规律,并提出了设计和施工方面防止过大温度应力的建议。 Temperature field in Kalangu continuous beam bridge has been measured with the embedded sensors. Combined with finite element software ANSYS to establish the 0# section finite element model, we study the concrete continuous girder bridge construction stress control method, and optimize the high temperature difference areas of the continuous girder bridge construction monitoring program and ensure the safety of bridge in construction process, to ensure the bridge into the linear meet the design requirements.
出处 《四川建筑科学研究》 2013年第1期56-59,共4页 Sichuan Building Science
基金 新疆维吾尔自治区高等学校科研计划重点项目(XJEDU2010I10) 新疆大学横向科研项目:新疆南疆高温差 干旱地区温度应力对铁路连续箱梁桥施工影响研究及应用
关键词 连续箱梁 应力 有限元 监控 continuous girder stress ANSYS monitori
  • 相关文献

参考文献5

  • 1Gajda J. Controlling Temperature in Mass Concrete[J].Concrete International,2002,(01):59-62.
  • 2BAZANT Z P,SANTOSH P. Solidification theory for concrete creep Ⅰ:formulation[J].J of English Mech,1989,(3308):1691-1703.
  • 3孙彦仕,胡长明,李永辉,毛庆东.某基础承台大体积混凝土裂缝控制及温控监测分析[J].建筑结构,2008,38(12):95-97. 被引量:9
  • 4彭立海;阎士勤.大体积混凝土温控与防裂[M]郑州:黄河水利出版社,2005.
  • 5李守义;张金凯.碾压混凝土坝温度应力仿真计算研究[M]北京:中国水利水电出版社,2010.