摘要 大庆炼化聚丙烯厂二套聚丙烯装置两台布克哈德产的2K160-1E 1型丙烯迷宫压缩机,自投运转以来管道系统振动剧烈情况。为避免严重事故的发生,对压缩机组气管路系统及其支架存在的问题进行现场测量、勘察。根据勘测结果,结合现场实际,通过会议协商制定了可操作性较强的整改方案,使振动情况得到有效控制,以消除安全隐患,保障机组长期安全运转。 The 2K160-1E 1 type the propylene compressor unit two of the the Daqing Refining polypropylene plant two sets of polypropylene Burkhard production,the vibration of the piping system is very severe since running.In order to avoid the occurrence of serious accidents,the problem exists on the compressor group trachea Road system and its bracket-site measurements,survey.According to the survey results,combined with the actual site,and through meetings and consultations to develop a operability strong rectification program,effectively control the vibration to eliminate security risks and to protect the long-term safe operation of Unit.
作者 朱金虎
出处 《广东化工》 CAS 2013年第3期147-149,共3页 Guangdong Chemical Industry
关键词 压缩机 振动 管道 compressor vibration pipeline
  • 相关文献

参考文献1

  • 1石油、化学和气体工业设施用往复压缩机.

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部