期刊文献+

成都富水砂卵石地层盾构设备配置探讨 被引量:25

Discussion of the Modification Plan of the EPB TBM Applied in a Water-Rich Cobblestone Stratum in Chengdu
下载PDF
导出
摘要 成都地铁1、2号线成功地采用了盾构法施工,但由于成都地质条件以高富水、高卵石含量著称,到现在为止还存在刀具消耗成本大、换刀困难、地表易坍塌及刀盘和螺旋输送机磨损严重等实际问题。文章通过对成都富水砂卵石的地质特点和现用盾构设备的优缺点的分析,提出了将盾体进行适当改进的设想:刀盘由面板式改变为辐条式、螺旋输送机由轴式改变为带式、对卵石的处理方式由破碎为主变为全部排出,这样将可以大大降低施工成本,解决地表易坍塌的问题,创新改进后的盾构设备配置将更适合成都地铁盾构施工。 The shield construction technique was successfully used in the Chengdu metro lines 1 and 2. Because of the geological conditions of water-rich cobblestone, this project suffered from a high cost of cutter consumption, difficult cutter changing, surface subsidence, and serious wear to the cutter head and screw conveyor. By analyzing the geological features and advantages and disadvantages of the devices currently used on shield machines, a modification plan for the shield is suggested, including changing from a breasting pl belt for the conveyor, and from main breaking to total discharging, whic ate to a spoke for the cutter head, from a shaft to h resulted in greatly reduced construction costs.
作者 王国义
出处 《现代隧道技术》 EI 北大核心 2013年第1期34-39,共6页 Modern Tunnelling Technology
关键词 成都地质 坍塌 超挖 盾构选型 刀具配置 Geology in Chengdu Collapse Over-excavation Shield selection Cutters arrangement
  • 相关文献

参考文献9

二级参考文献16

  • 1张国京.北京地区土压式盾构刀具的适应性分析[J].市政技术,2005,23(1):9-13. 被引量:43
  • 2王梦恕.不同地层条件下的盾构与TBM选型[J].隧道建设,2006,26(2):1-3. 被引量:38
  • 3张明富 袁大军.盾构刀具磨损与使用寿命分析.现代隧道技术,2007,:323-327.
  • 4[1]Japanese Standard for Shield Tunneling [Z]. Tokyo Japan:Japan Society of Civil Engineers, 1996.
  • 5[2]小泉淳,等.シ-ルド工法の调查·设计から施工まで[M].日本东京都:地盘工学会,1997.
  • 6[3]远藤浩三,等.土压系シ-ルド工法[M].日本东京都:鹿岛出版会,1982.
  • 7[4]矢野信太郎.シ-ルド工法.[M].日本东京都:鹿岛出版会,1980.
  • 8[5]三好迪男,等.シ-ルド工法の完实际[M].日本东京都:鹿岛出版会,1980.
  • 9[3]张风祥,朱合华,傅德明.盾构隧道[M].北京:人民交通出版社,2004.
  • 10竺维彬,鞠世健.试论复合地层盾构施工的理论体系[J].现代隧道技术,2007,(增刊):1-6.