摘要
本文介绍了运架一体式架梁机的组成结构,施工前的各项准备工作。本文详细阐述了运架一体式架梁机进出隧道架设第一孔或最后一孔双线整孔预制箱梁的施工技术。
This article describes the structure composition of the transported frame integrated girder machine and the preparatory work before construction. This paper describes the double track prefabricated box girder construction technology of entering and going out the first or last hole of tunnel for the transported frame integrated girder machine.
出处
《价值工程》
2013年第7期59-61,共3页
Value Engineering
关键词
运架一体机
吊运梁机
导梁机
驮梁小车
transported frame integrated girder machine
lifting beam
guide beams
beam support dolly