期刊文献+

基于Matlab的井下无轨运输系统仿真 被引量:2

Simulation of Underground Trackless Transportation System Based on Matlab
原文传递
导出
摘要 为了提高地下矿无轨运输设备的利用率,在Matlab运行环境下,采用事件步长法,将事件类型时钟值作为时间进程的控制对象,实现了对某地下矿运输系统的仿真。仿真结果表明,调度配车方式用于地下矿能有效提高无轨运输设备的利用率;此外,增加卡车数量亦能进一步提升地下矿运输能力。仿真结果清晰、直观,为矿山企业提高生产运输效能提供了依据。 To improye the utilization rate of trackless trans- porting system in underground mine, in the Matlab environ- ment, taking clock value of event type as controlled object of timer process, the transport system of an underground mine was simulated using next event incrementing method. The result demonstrated that truck-dispatching system is an ef- fective way to improve the utilization rate of trackless trans- port equipment in underground mine. Moreover, the in- crease of amount of truck can further improve the transport capacity of underground mine. The result of simulation was legible and intuitional, and provided a basis for mine to im- prove transportation efficiency.
机构地区 北京科技大学
出处 《矿业研究与开发》 CAS 北大核心 2013年第1期88-91,109,共5页 Mining Research and Development
基金 国家自然科学基金资助项目(51174260 51174032)
关键词 地下矿 运输系统 无轨设备 生产调度 Underground mine, Transportation system,Trackless equipment, Production dispatch
  • 相关文献

参考文献6

二级参考文献6

共引文献175

同被引文献25

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部