摘要 以石家庄客站为例,分析了大型客站的供电方案;从景观设计、道岔布置、多支悬挂、分离设计和悬挂安装5个方面论述了接触网平面布置需要注意的事项;同时叙述了接触网和雨棚、高架候车区域、排水沟、综合管线接口的重要性。 Using Shijiazhuang Railway Station as an example, the paper analyzes power supply solutions for large passenger stations and discusses points to note in OCS layout from five aspects: landscape design, turnout layout, multi-vessel suspension, separation design and hanging installation; moreover, the paper also describes the importance of OCS and canopy, elevated waiting area, drainage ditches and the integrated pipeline interface.
作者 邓洪
出处 《电气化铁道》 2013年第1期36-39,共4页 Electric Railway
关键词 高速铁路 大型客站 接触网 供电方案 平面布置 接口 high-speed railway large passenger station OCS power supply solution layout interface
  • 相关文献

参考文献3

  • 1于万聚.高速电气化铁路接触网[M].成都:西南交通大学出版社.2005
  • 2Kief31ing,Puschmann,Schmieder.电气化铁道接触网[M].中铁电气化局集团译.北京:中国电力出版社,2004.
  • 3TB10621-2009.高速铁路设计规范(试行)[S].北京:中国铁道出版社,2010.

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部