期刊文献+

百色水利枢纽地下式升压站布置

Arrangement of Underground GIS Step-up Substation for the Power Station of Baise Project
下载PDF
导出
摘要 基于GIS升压站设备小型化和对洞室围岩的新认识 ,介绍招标设计阶段将百色水利枢纽地下水电站的主变压器及升压站布置于地下洞室中 ,在设计中突破了规范和常规 ,以较小的围岩厚度尤其是上覆岩体厚度使布置更为合理与经济。经围岩稳定分析 ,结果表明洞室布置合理可行。 Base on the new knowledge about cavity surrounding rock and the small_size for the equipments of GIS ,the main transformers and GIS step_up substation of Baise project are arranged in underground cavity with diabase in the stage of bidding design.The design makes a breakthrough in the standard and convention with less thickness,particularly the cover on the cavities of surrounding rock.The results of analysis shown that the arrangement are resonable and economic,and the cavities arrangement is more closed and characterized.
作者 覃永恒
出处 《红水河》 2000年第3期42-45,共4页 Hongshui River
关键词 升压站 地下式 围岩 百色水利枢纽 step_up substation,underground type,surrounding rock,Baise WRPP.
  • 相关文献

参考文献1

二级参考文献2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部