在莲花水电站设计中,通过水力学试验和结构计算对引水系统的进水口、引水隧洞 及调压井进行了优化设计,节省了工程量,加快了施工进度,取得了较大的经济效益与社会 效益。
The optimization design was done for water intake of water diversion system, diversion tunnel and surge shaft in the design of Lianhua hydropower st a tion. The works quantity was saved, construction progress was quickened, and t he foundation was laid for advancing generation power.
出处
《东北水利水电》
2000年第9期4-5,共2页
Water Resources & Hydropower of Northeast China
关键词
引水系统
优化设计
莲花水电站
water diversion system
optimization design