三峡工程茅坪溪防护土石坝施工期安全监测 被引量:3

Safety monitoring during construction period at TGP's Maopingxi Protective Dam
下载PDF
导出
摘要 介绍了三峡工程茅坪溪防护坝的安全监测布置和沥青混凝土心墙在施工期的温度变化 ,如墙体突破软化点的深度。通过资料分析并及时调整施工程序 ,控制了因两侧过渡料碾压不均衡产生的墙底接触面错动。 This paper introduces the arrangement of safety monitoring of TGP's Maopingxi Protective Dam and the duration of temperature inside the asphalt concrete core wall at construction period (such as the depth where the temperature of the core wall exceeding its softening point).By analysing the monitoring data and adjusting the construction procedure in time,the relative displacement at contact surface of the wall footing caused by non uniform roller compaction of transient materials on both sides of core wall has been controlled.
作者 刘洪 张利军
出处 《长江科学院院报》 CSCD 北大核心 2000年第5期36-38,共3页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 防护坝 施工期 土石坝 安全监测 Three Gores Project(TGP) protective dam asphalt concrete core wall construction period safety monitoring
  • 相关文献

参考文献2

  • 1张光斗,水工建筑物,1994年
  • 2张启岳,土石坝观测技术,1993年

同被引文献20

引证文献3

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部