期刊文献+

防喷器控制装置三位四通转阀手柄位置分析 被引量:8

Analysis of Four-way Valve Handle Position on BOP Control System
下载PDF
导出
摘要 在正常钻井过程中,防喷器控制装置的三位四通转阀手柄是置于中位,还是和防喷器保持一致的开位或关位,一直是国内井控管理人员争论的话题。通过对国内外行业标准的对比、防喷器控制装置及三位四通转阀工作原理的分析,阐明了转阀手柄位置应和防喷器开、关位置保持一致的必要性。为防喷器控制装置在井控中的安全使用提供理论依据。 In normal drilling process, whether the four--way valve position on BOP control system should be remained in the middle or kept up with BOP device has been all the time a controversial topic argued by domestic well control administrators. Through the comparison of domestic and in- ternational industry standards, and the analysis of working principle of BOP control system and four--way valve, this article illustrates the necessity of the four--way valve handle position which should be kept up with the switch of BOP device,and further provide a theoretical basis for safety applications of BOP control system in the well control process.
机构地区 北京石油机械厂
出处 《石油矿场机械》 2013年第2期66-69,共4页 Oil Field Equipment
关键词 防喷器控制装置 三位四通转阀 手柄位置 BOP control system four-way valves handle position
  • 相关文献

参考文献7

二级参考文献8

  • 1SY/T5964-2006钻井井控装置组合配套、安装调试与维护[S].
  • 2API Spec 16D-2004 Specification for control systems for drilling well'control equipment and control systems for diverter equipment[S].
  • 3孙孝真.实用井控手册[M].北京:石油工业出版社,2010:58-60.
  • 4SY/T66162005含硫油气井钻井井控装置配套、安装和使用规范[S].
  • 5SY/T5053.1-2000防喷器及控制装置:防喷器[S].
  • 6SY/T6426-2005.钻井井控技术规程[S].
  • 7沈泽俊,陈香凯,李洪敏.一种经济实用的新阀——差动阀[J].液压与气动,1997,21(5):14-15. 被引量:1
  • 8张桂林,苏山林,王延文.防喷器操作手柄最佳位置的讨论[J].天然气勘探与开发,2008,31(4):47-51. 被引量:6

共引文献16

同被引文献23

  • 1孙孝真.实用井控手册[M].北京:石油工业出版社,2010:58-60.
  • 2SY/T6426-2005.钻井井控技术规程[S].
  • 3SY/T5053.2-2007钻井井口控制设备及分流设备控制系统规范[S].
  • 4Recommended Practices for Blowout Prevention Equip- ment Systems for Drilling Wells API RP53 Third edi- tion[R]. MARCH, 1997.
  • 5APISpec16D-2004,钻井控制设备的控制系统[S].
  • 6API RP 53—1997Recommend practices for blowout prevention equipment systemes for drilling wells[S].
  • 7Shell Group of Companies.Restricted pressure control manua for drilling,completion and well intervention operations WS38.80.00.18-Gen[S].2011.
  • 8RIG Train-Drilling ang Well Services Training.DTL-A Weatherford Company[M].2001:chapter 7:80-91.
  • 9API RP53, Recommend Practices for Blowout Preven- tion Equipment Systemes for Drilling Wells[S]. 1997.
  • 10Shell Group of Company. Restricted Pressure Control Manual for Drilling, Completion and Well Intervention Operations[K]. 2011.

引证文献8

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部