摘要
介绍了40万t/a聚氯乙烯项目工程造价控制管理情况,通过对工程进行分解和预控,使工程总造价控制在21亿元左右,达到了有效控制工程造价的目的。
The control and management on the cost of 400 kt/a PVC project were introduced. Through decomposition and pre-control on the project, the total project cost was controlled around 2 100 million RMB M, achieving the aims of controlling the total project cost effectively.
出处
《聚氯乙烯》
CAS
2013年第1期20-21,46,共3页
Polyvinyl Chloride
关键词
聚氯乙烯
工程造价
概算
监理
PVC
project cost
budget estimate
supervision