基桩设计是高桩码头的主要设计内容之一,必须采用适宜的桩型以及桩结构来协调桩、土关系。桩型选定后,必要时可对基桩结构进行合理优化提高其性价比,既降低桩基造价而又不致增加太多的施工难度,文章就此进行探讨,提出了三条解决思路。
Design of piled foundations is one of the main contents of piled wharf designs. Adopting the suitable pile types and pile structures to coordinate the relation between the pile and soil is necessary. After a pile type is selected, the pile structure can be optimized reasonably to improve the ratio of performance to price, if necessary. The optimization measures can not only reduce the pile cost, but also not increase too much construction difficulty. Based on this, a discussion is carried out in this paper and three solutions are proposed.