摘要
煤矿生产过程中会有一定量矿井水生成,必须及时将其排出,否则将会对生产的顺利进行造成不利影响,甚至会导致塌方事故的发生。文章首先对矿井排水综合自动化系统设计方案进行简单介绍,之后对系统的硬件选择以及具体的工作流程进行详细阐述。
A certain amount of mine water will be generated in the coal mine production process. It must be immediately discharged, Otherwise will affect the production, and even cause landslides accidents. In the paper, the design scheme of the mine drainage integrated automation system is simply described, then the hardware choice of the system and the working process are expounded.
出处
《煤炭技术》
CAS
北大核心
2013年第3期67-69,共3页
Coal Technology
关键词
煤矿矿井水
排水综合自动化系统
硬件
工作流程
coal mine water
drainage integrated automation system
hardware
work process