摘要
北京亮马河污水隧道是北京市第一次采用盾构法施工实施的地下工程。本文简要介绍了亮马河污水隧道的结构选型、结构计算、横断面设计、纵向设计和抗震等设计内容。
Lining of Liang Ma River sewer tunnel is the first tunnel constructed by shield method in Beijing. This paper introduces the structure type choosing, structure calculation, cross sec-tion design, longitudinal design and earthquake resistant design for the shield tunnel.
出处
《地下工程与隧道》
2000年第2期27-31,共5页
Underground Engineering and Tunnels