摘要
《石羊河流域重点治理规划》实施5年后及中期目标已经实现的背景下,回头审视解读规划,可以看到有4个显著特点:第一,以水权分配为抓手,全面实施用水总量控制;第二,以定额管理为指导,合理促进经济结构调整;第三,以系统分析为基础,科学设计规划控制指标;第四,以流域区域相结合,共同保障治理目标实现。结合《规划》的实施情况及调整实施方案,提出了实现石羊河流域重点治理2020年约束性指标共同的期待。
After five years' implementation of Key Master Plan of Shiyang River Basin, the medium-term targets of plan have been realized. Four outstanding features are found in the post-evaluation of the plan. First, focus is placed on water right allocation and control of total water consumption. Second, quota management is used in water consumption for a rational adjustment of industrial structures. Third, water use index is planned based on systematic analysis. Finally, ensuring target realization is proposed by integrating planning of river basin and administrative regions. A planning of water use index for Shiyang River Basin in 2020 is proposed in accordance with the actual condition of implementation of the master plan with necessary adjustments.
出处
《中国水利》
2013年第5期29-32,38,共5页
China Water Resources
关键词
石羊河流域
治理规划
水权分配
控制指标
分析
Shiyang River Basin
management plan
water right allocation
control index
evaluation