摘要
从工艺原理、安装施工要求、操作要领等方面 ,介绍液压提升工艺在高度 2 9m水塔的 5 0
The paper introduced the hydraulic pressure hoist method to install a 500m 3 upside down conical concrete water container on the height of 29m concrete column with the hoist process,installation equipment & operation know-how etc
出处
《石油工程建设》
2000年第5期21-22,共2页
Petroleum Engineering Construction