5HATCHER P, KHALILPOUR R, ABBAS A. Optimizationof LNG mixed-refrigerant processes considering operationand design objectives[J].Computers and ChemicalEngineering, 2012, 41: 123-133.
6ASPELUND A, GUNDERSEN T, MYKLEBUST J,et al.An optimization-simulation model for a simple LNGprocess[J].Computers and Chemical Engineering, 2010,34(10): 1606-1617.
7XU X W, LIU J P, CAO L. Optimization and analysis ofmixed refrigerant composition for the PRICO natural gasliquefaction process[J].Cryogenics, 2014, 59(1): 60-69.
8REMELJEJ C, HOADLEY A. An exergy analysis ofsmall-scale liquefied natural gas (LNG) liquefactionprocesses[J].Energy, 2006, 31(12): 2005-2019.
9HET B, JU Y L. Design and Optimization of a NovelMixed Refrigerant Cycle Integrated with NGL RecoveryProcess for Small-Scale LNG Plant[J].Industrial andEngineering Chemistry Research, 2014, 53(13): 5545-5553.