期刊文献+

催化裂化装置外取热器管束吊装方案探讨

Discussion on lifting plan for external heat removing tube bundle of Catalytic Cracking Unit
下载PDF
导出
摘要 某重油催化装置的取热器管束泄漏,需要整体更换。由于该取热器管束的结构特殊,吊装更换作业空间狭窄,且施工时间紧迫,管束的吊装施工难度很大。文中对其结构进行了受力分析,制定了合理的吊装施工方案,为类似设备安装施工提供了参考。 The heat remover tube bundle of a Catalytic Cracking Unit need to be integrally changed because of its leak. As this heat remover tube bundle ’ s structure is special , lifting operation space is narrow , construction time is pressing , and the difficulty of lifting work of the bundle is very high. This paper made loading stress analysis to its structure , established reasonable lifting work plan , and provided reference for similar equipment installation work.
作者 张国静
出处 《炼油与化工》 2013年第1期24-26,61-62,共3页 Refining And Chemical Industry
关键词 管束 吊装 吊车 施工 tube bundle lifting crane work
  • 相关文献

参考文献7

二级参考文献3

  • 1起重吊装计算及安全技术[M].北京:中国建筑工业出版社,2009.
  • 2王业洛.中国高新技术企业[J]吊装技术,2010(08):78-80.
  • 3高家权.大型钢结构井架吊装关键技术[J]地基处理,2011(03):3-4.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部