期刊文献+

山区电气化铁道设计捷接线的必要性 被引量:1

山区电气化铁道设计捷接线的必要性
下载PDF
导出
摘要 结合鹰厦线漳厦段电气化铁道设计捷接线及其防护效果进行了分析。“捷接线”区段合理设置吸流变压器 ,可以减少其安装数量 ,提高其牵引供电系统的供电质量 ,并达到牵引供电系统的防护要求。 The traction power supply system design and the effect of the protection system for the section with shortcut circuit will be analyzed in this paper,combining with the Railway Electrification Engineering Design of the Zhangping-Xiamen Section of Yingtan-Xiamen Railway.On the section with short-cut circuit,the reasonable arrangement of BT will decrease the number of BT to be installed,improve the quality of the traction power supply system,and satisfy the protection requirement of the traction power supply system.
作者 康俐娟
出处 《电气化铁道》 2000年第4期10-11,共2页 Electric Railway
关键词 捷接线 设计 分析 short-cut circuit design analysis
  • 相关文献

同被引文献23

  • 1刘海东,何天健,袁振洲,毛保华,丁勇.城市轨道交通直流牵引供电仿真系统的研究[J].系统仿真学报,2004,16(9):1944-1947. 被引量:24
  • 2池云莉,何天健,梁嘉杰.电气化铁道系统概率潮流算法研究[J].电气化铁道,2004(6):4-8. 被引量:16
  • 3Richard A Vher.http://users.telerama.com/~urichard/rsc_1.htm.
  • 4Mellon Institute,Carnegie Mellon University.Users Manual for the Transportation System Energy Model Rail System Center[K].Pittsburgh,pa:Mellon Institute,1986.
  • 5Kutsmeda K J,Fehrle K G,Trick P J.Computer modeling,simulation,and validation by field testing of a traction power system for electric trolley buses,Railroad Conference[Z].Baltimore md:Railroad Conference,Proceedings of the 1995IEEE/ASME Joint,1995:87-91.
  • 6Yingjie WANG,Li-min JLA,Axin NIE,Fuzhang WANG.Intelligent Simulation system for Guangzhou-Shenzhen Railway Operation[Z].Oakland,ca:IEEE Intelligent Transportation Systems Conference Proceedings-Oakland (CA) USA,2001:1079-1083.
  • 7Mellitt B,Goodman C J,Arthurton R I M.Simulator for studying operational and power-supply conditions in rapid-transit railways[J].Proc.IEE,1978,125(4):298-303.
  • 8Rambukwella N B,Mellitt B,Goodman C J,Mouneimne Z S.Traction equipment modeling and the power networks solution for DC supplied rapid transit power system studies[Z].London:IEE Conference on Electric Railway Systems for a New Century,1987:218-224.
  • 9Talukdar S N,Koo R L.The analysis of electrified ground transportation network[J].IEEE Trans.Power Appl.Systems,1977,76(1):240-247.
  • 10Goodman C J,Kulworawanichpong T.Sequential linear power flow solution for AC Electric Railway Power Supply Systems[J].Computers in Railways Ⅷ,2002:531-540.

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部